FOR // INFRASTRUCTURE TEAMS

Built for Infrastructure Delivery Teams Operating Under Programme and Safety Pressure

Infrastructure projects — utilities, rail, highways, and civils — involve some of the most demanding cable installation environments in the UK. Long runs, difficult access, tight possession windows, and safety-critical requirements mean standard installation methods often fall short. Titan SCD is designed for infrastructure scale and complexity.

What You're Responsible For

Smart cable pulling is designed around the delivery pressures that matter to infrastructure teams — programme certainty, installation quality, safety performance, and the compliance documentation you need at handover.

  • Utilities and network infrastructure delivery
  • Rail and transport framework management
  • Civils package electrical coordination
  • Framework and NEC contract compliance
  • Site safety and health management on live infrastructure

Where This Applies

Titan SCD is deployed across major UK projects in the following sectors:

Utilities & EnergyRail & TransportHighways & CivilsRenewablesSubstations & Grid

Built Around What Matters to Infrastructure Teams

BENEFIT

Long-run tension control

Conventional winch pulling accumulates tension over distance — damaging HV and MV cables on extended underground or overhead routes. Distributed drive resets at every unit.

BENEFIT

Access-constrained environments

The 28 kg chassis fits through access hatches, plant room entries, and constrained utility access points — deployable where larger equipment cannot go.

BENEFIT

Safety on active infrastructure

Reduced snap-back risk and lower peak tension protect operatives working in confined, underground, or hazardous infrastructure environments.

BENEFIT

Framework documentation compliance

Pull audit logs meet the documentation requirements of framework contracts, network operator specifications, and regulatory compliance for utility infrastructure.

BENEFIT

Possession and window efficiency

Fast 15-minute deployment means more usable time within tight possession and access windows — critical on rail and utilities frameworks.

What Changes When You Use Titan SCD

The Technology Behind It

5 kN
Pulling Force
<300 lbs
Peak Tension Per Unit
40%
Faster Than Manual
BS 7671
Certified
IP67
Rated

Speak to Us About Your Infrastructure Project

From network reinforcement and substation upgrades to rail framework delivery and renewables infrastructure, we support infrastructure teams on technically demanding cable installation programmes.