Maximum Force Output
Industry-leading 5 kN pulling force with real-time load monitoring and automatic overload protection for cables up to 60mm diameter.
Precision-engineered for the demands of modern electrical infrastructure.
Industry-leading 5 kN pulling force with real-time load monitoring and automatic overload protection for cables up to 60mm diameter.
Fully compliant with UK wiring regulations. Every pull operation is logged, time-stamped, and exportable for your O&M documentation package.
Compact 28 kg chassis fits through standard door openings. Two-person setup, no specialist training required. Glove-operable controls.
A conventional winch accumulates tension along the entire cable run — peaking above 8,000 lbs at the head. Our distributed drive resets tension at every unit, keeping each section under 300 lbs and eliminating snap-back risk entirely.
Tension accumulation comparison — illustrative. Figures based on published system data.
Every parameter engineered to IET Wiring Regulations and site-safety standards.
| Performance | |
|---|---|
| Maximum Pulling Force | 5 kN |
| Maximum Cable Diameter | 60 mm |
| Minimum Cable Diameter | 10 mm |
| Maximum Pull Speed | 8 m/min (variable) |
| Overload Protection | Automatic cutoff at rated limit |
| Force Monitoring | Real-time load display, ±2 % accuracy |
| Mechanical & Build | |
| System Weight | 28 kg |
| Drive Type | Dual-motor capstan drive |
| Frame Material | Powder-coated steel chassis |
| Control Interface | Glove-operable panel with e-stop |
| Power Supply | 110 V / 230 V AC (site power) or battery pack |
| Portability | Fits through standard 760 mm door opening |
| Compliance & Certification | |
| Wiring Regulation | BS 7671:2018 + A2:2022 (18th Edition) |
| IP Rating | IP67 — dust-tight, 1 m immersion |
| Data Logging | Full audit trail: force, speed, timestamps |
| Export Formats | PDF & CSV for O&M documentation |
| Safety Standard | BS EN ISO 13849 (machinery safety) |
| Deployment & Support | |
| Setup Time | <15 minutes, 2-person crew |
| Training Required | None — intuitive on-panel guidance |
| Coverage | UK-Wide |
| Technical Support | 24/7 phone & remote diagnostics |
Tell us about your project and a specialist will reach out to arrange an on-site demonstration or bespoke quote — typically within one working day.
Get a bespoke quote for your project. Our team of specialists will assess your cable schedule, site conditions, and tray routing — and deliver a system tailored to your exact requirements.