FOR // ELECTRICAL CONTRACTORS

More Output. Less Risk. Better Compliance. For Electrical Contractors on Major Projects.

Electrical contractors on large projects face constant pressure on productivity, installation quality, and compliance documentation. Cable pulling is one of the most physically demanding and risk-prone activities on site. Titan SCD transforms it — making your team faster, safer, and audit-ready from the first pull.

What You're Responsible For

Smart cable pulling is designed around the delivery pressures that matter to electrical contractors — programme certainty, installation quality, safety performance, and the compliance documentation you need at handover.

  • Cable installation productivity and programme performance
  • Labour deployment and operatives management
  • Installation quality and rework avoidance
  • BS 7671 compliance and O&M documentation
  • Health and safety on cable installation operations

Where This Applies

Titan SCD is deployed across major UK projects in the following sectors:

Data CentresUtilities & EnergyRail & TransportCommercial DevelopmentsIndustrial & Manufacturing

Built Around What Matters to Electrical Contractors

BENEFIT

Productivity gain of up to 40%

Faster cable pulls, less manual effort, and consistent output means your team gets through more volume in the same programme time.

BENEFIT

Significant reduction in manual handling

The system carries the pulling load. Your operatives guide and manage the cable — dramatically reducing physical strain and associated injury risk.

BENEFIT

Elimination of cable damage risk

Conventional winch tension can damage sheaths on longer or more complex routes. Distributed drive keeps tension controlled at every point — eliminating rework.

BENEFIT

Built-in compliance documentation

Every pull is automatically logged — tension, speed, duration, timestamp. Exportable as PDF or CSV directly into your O&M and handover package.

BENEFIT

Flexible and site-ready

28 kg, fits through standard door openings, site-ready in under 15 minutes. Moves between zones and floors as your programme demands.

What Changes When You Use Titan SCD

The Technology Behind It

5 kN
Pulling Force
<300 lbs
Peak Tension Per Unit
40%
Faster Than Manual
BS 7671
Certified
IP67
Rated

Find Out How Titan SCD Fits Your Projects

If you are managing a large cable installation programme and need faster output with better compliance, talk to us about how our system integrates with your site operations.